For Production Critical Environments

Solve What Matters.

See what threatens production. Solve the underlying cause.

ayjah connects production-risk visibility, a suite of root-cause analysis tools and AI-assisted reporting. Teams prioritise the problems that matter, coordinate action across departments, prevent repeat failures and protect asset performance.

Built for Asset, Production and Reliability Managers — and the leaders they report to.

Production at Risk registerIllustrative data
Active production risks8
High or critical3
Overdue actions2
Linked RCAs2
Illustrative Production at Risk register
PaR IDThreatLeadExposure (est.)Priority
PaR-001
Compressor C-201 recurring vibration
Gas processing · RCA-012 open
A. Morgan4,200 bbl/dper trip, ~6 h · basis belowHigh
PaR-003
HSSEFirewater pump assurance gap
Offsites
R. KhalidPlant-widelicence-to-operate riskHigh
PaR-005
Cooling-water exchanger fouling
Utilities
S. Nair1,800 bbl/drate cut in summerMedium
PaR-008
Instrument-air leak at header
Utilities
T. Omar650 bbl/dif compressor tripsLow
Illustrative register based on the ayjah PaR layout. Names and figures are examples, not customer data.

ayjah celebrates the people who solve what matters most—and make the fix last.

  • Operator

    The Operator who sees what others miss.

  • Technician

    The Technician who solves the underlying problem.

  • Engineer

    The Engineer who asks the uncomfortable question.

  • Leader

    The Leader who clears the way for work that matters most.

The problem

Not every problem deserves the same attention.

Urgent requests, departmental priorities and new initiatives all compete for the same people. The issue that most threatens production can sit quietly behind them.

01

Competing priorities

Operations, maintenance and engineering each rank their own list. The loudest item wins, not the costliest.

02

Fragmented information

Threats live in spreadsheets, actions in work orders, findings in reports. Nobody sees the whole picture.

03

Fixes that don’t last

Actions slip between departments. Nobody checks whether the fix worked, so the same failure returns.

You may already have a threat register and an RCA procedure. The gap is turning them into results. ayjah connects the priority to the cause, the cause to the action, and the action to proof that it worked.

How it works

One problem, followed from priority to proof.

An illustrative scenario: Compressor C-201 has tripped three times in six weeks.

Identify production exposure

The threat is logged once, with an estimate of what it could cost and the basis for that estimate.

Exposure (estimate)4,200 bbl/d for ~6 h per trip
BasisTrain 2 rate × share lost on trip, from last 3 events
Evidence3 trips in 6 weeks · vibration trend
OwnerA. Morgan, Rotating Equipment

Agree priorities

Managers see the same ranked register and vote on focus, so the reason for priority is visible to everyone.

Reason for priorityHighest repeat exposure in gas processing
Management focusBacked by Production and Asset Managers
Support neededMaintenance planning · Operations
Review dateWeekly PaR meeting

Investigate causes

An RCA opens straight from the PaR item, using the timeline, cause and effect, 5 Whys and fishbone tools.

Linked RCARCA-012
Tools usedTimeline · 5 Whys · Fishbone
EvidenceLube-oil temperature log, fan B alarm history
Root cause (draft)No standby check on cooler fans

Assign and complete actions

Each action has an owner, a due date and the department expected to help.

ACT-031Add weekly cooler fan check · Maintenance · due 14 Nov
ACT-032Escalate fan alarms to shift lead · Operations · due 7 Nov
ACT-033Replace fan B motor · Maintenance · overdue 3 days
Visible toOwners, managers and the PaR lead

Verify effectiveness

A check date is set when the actions close. The PaR item stays open until the evidence says the fix held.

Effectiveness check90 days with no repeat trip
MeasureTrip count · drive-end bearing vibration
Checked byReliability Engineer
StatusDue 20 Feb

Retain the learning

The finished investigation becomes a report and a lesson the next team can find. AI drafting for this step is planned.

LessonSingle fan failure can trip a compressor in high ambient
Applies toSimilar air-cooled lube systems
ReportRCA-012 final, human-reviewed
StatusAI drafting planned

Identify production exposure → agree priorities → investigate causes → assign and complete actions → verify effectiveness → retain the learning.

Products

Four connected products. One line of sight from risk to result.

Available

Production at Risk (PaR)

One ranked register of what threatens production, with exposure, owners, management focus and actions in one place.

  • KPI view of active risks, reviews due and overdue actions
  • Management focus voting and comments
  • Actions tracked against each threat
See PaR in the workflow →

Available Some tools planned

RCA Intelligence

Structured root-cause tools that open straight from a PaR item, so the investigation stays tied to the production risk.

  • Available: RCA tracker, timeline builder, cause and effect, 5 Whys, fishbone, 5 causal questions
  • Planned: Is / Is Not analysis
Explore the RCA tools →

In development

Reliability & Maintenance Intelligence

Reliability and maintenance views being built inside the same workspace, so equipment performance and repeat failures can feed the PaR register.

Ask about early access →

Planned

AI Report Writing

Drafts RCA reports and lessons from the evidence your team has already captured. Every draft is reviewed and approved by a person before it is issued.

See the report preview →

PaR decides what matters. RCA Intelligence finds why it happens. Reliability & Maintenance Intelligence shows where it may happen next. AI Report Writing captures what was learned.

RCA Intelligence

Find the cause you can fix. Then prove it’s fixed.

Structured tools in one investigation, linked to the production risk that started it. Screens below use illustrative data.

CONDITIONLube-oil temperature rising02:10
OBSERVATIONCooler fan B alarm acknowledged02:34
EVENTC-201 trips on high vibration03:02

Sequence shows the alarm was acknowledged 28 minutes before the trip.

Production exposure

Estimates you can challenge, not numbers you have to trust.

Every exposure figure in PaR carries its basis. Managers can see the assumptions, question them and agree a priority on the same facts.

PaR-001 exposure basis Illustrative

Train 2 design rate
12,000 bbl/d
Share lost while C-201 is down
35%
Rate at risk during a trip
4,200 bbl/d
Typical restart time (last 3 events)
~6 h
Loss per trip (estimate)
~1,050 bbl

Assumptions are entered by the PaR lead and can be updated as evidence improves.

Who it’s for

Built for the managers who own production — and the leaders who fund the fix.

Asset Managers

See which threats carry the most exposure across the asset, and where resources should go first.

Production Managers

Get one agreed list in place of competing ones, with owners and due dates everyone can see.

Reliability Managers

Run investigations that reach a fixable cause, and check that the fix held.

Senior leaders

The business case: fewer repeat failures, less lost production and decisions you can explain.

An LNG export terminal at night: spherical storage tanks lit along the shore, an LNG carrier moored at the jetty and a flare burning in the background.

Built from the plant floor

Built around how operations actually work.

Shaped by operational experience across the UK, Australia, the Middle East and South Korea, ayjah is designed for the realities of live assets—not idealised workflows.

Threats compete for attention. RCAs stall. Actions cross functions. ayjah helps teams see what matters, solve the underlying cause and follow critical work through.

Implementation

Start with your existing threat register and RCA procedure. Details are confirmed during the demo.

Data you need

A list of current production threats, owners and open actions. A spreadsheet is enough to begin.

Integrations

No integrations are published yet. Tell us which systems you use and we’ll discuss what’s possible.

Security

Ask us for our current security and data-handling approach. No certifications are claimed at this stage.

About ayjah

Why ayjah exists.

ayjah was born from a frustration seen repeatedly inside asset-intensive operations: too often, what gets attention is not what matters most. Production does not respond to confidence or hierarchy. It responds to physics, failure modes, operating discipline and follow-through.

Solve What Matters.

Bring one production threat. We’ll walk it from priority to proof in a 30-minute demo.